I&Y Construction Completes Retrofit at NW Lehigh High School
I&Y Construction Completes Retrofit + Show-Light® System at Northwest Lehigh High School
I&Y Construction is proud to announce the successful completion of a 4-pole retrofit + Show-Light® MUSCO system upgrade at Northwest Lehigh High School in New Tripoli, Pennsylvania. The project enhanced the football field’s existing lighting infrastructure by upgrading four 65-foot poles with MUSCO’s industry-leading TLC for LED™ system, delivering improved performance, energy efficiency, and enhanced game-day atmosphere.
As the installer, I&Y Construction worked closely with MUSCO Sports Lighting to modernize the field while maximizing the value of the existing pole structures. The result is a high-performance lighting system designed to serve the Tigers and the community for years to come.
A Proud Community: Northwest Lehigh & the Tigers
Northwest Lehigh High School serves a strong and growing community in Lehigh County. Located in the scenic rural setting of New Tripoli, the district blends small-town pride with competitive athletics. The school’s mascot, the Tiger, represents strength and determination—qualities reflected in both its academic programs and athletic success.
Project Scope: 4-Pole Retrofit + Show-Light® Upgrade
This project focused on modernizing the existing infrastructure while incorporating MUSCO’s advanced LED and control technologies.
- Pole Retrofit – Football Field
- Retrofitted four (4) existing 65-foot poles
- Removed outdated lighting equipment
- Installed MUSCO’s TLC for LED™ fixtures
- Show-Light® Integration
- Integrated MUSCO’s Show-Light® entertainment lighting system
The Show-Light® system transforms the field from a traditional playing surface into a dynamic, interactive experience that elevates school spirit and enhances the fan experience.
Delivering Modern Performance While Preserving Infrastructure
Retrofit projects require precision planning and coordination. I&Y Construction ensured that all new MUSCO components were installed to exact specifications, maintaining proper alignment and aiming to deliver optimal field illumination.
With over 450 completed sports lighting projects, I&Y Construction continues to be the trusted MUSCO installer throughout Pennsylvania and the Mid-Atlantic region. Our experience in retrofit installations allows districts like Northwest Lehigh to upgrade efficiently while minimizing downtime.
Project Summary
Project: Northwest Lehigh High School – Football Field Lighting Retrofit
Location: New Tripoli, Pennsylvania
Client: Northwest Lehigh School District
Lighting System: MUSCO Sports Lighting – TLC for LED™ + Show-Light®
Installer: I&Y Construction
Project Type: 4-Pole Retrofit
Scope of Work:
- Retrofit (4) existing 65′ football field poles
- Install MUSCO TLC for LED™ fixtures
- Integrate Show-Light® entertainment lighting system
- Upgrade controls and optimize aiming